Lidl to rebuild Luton Store
In 2015, Lidl, the well known discount grocery retailer, put forward plans to knock down and rebuild its Luton store (located in Frances Street, Luton, LU1 1HU), which is approximately 30 miles outside of central London.
Lidl, a German born company, is systematic in its simplistic approach to grocery retailing, with customer satisfaction at it's centre. Its key strategic aims have proved very successful (as the expansion of it's stores across Europe shows), and include simple, but effective approaches to what some may consider an overly complex grocery sector:
- Keeps product ranges simple, to avoid overloading ranges for customers.
- Operates an efficient and fully stocked distribution network of lorries.
- Provides both branded and own products at low prices.
- Manages and trains a multi-functional workforce providing an efficient shop floor service.
As a result, and presumably based on this strategy, Lidl decided upon a novel approach to expansion of its retail property portfolio - a 'rip it down and start again' approach rather than a 'bolt on' one.
The existing store in Luton, with a retail space of approximately 1,500 square metres, will be expanded in the rebuild to an approximate retail space of 2,460 square metres, giving greater scope for higher stock levels, as opposed to an increase of the product range. This strategy is to allow customers to find and purchase what they require in one visit (rather than needing return visits for out of stock items), and which hopefully will result in improved customer satisfaction.
Whilst the store will be expanded, the parking area will only be marginally reduced, resulting in a loss of just 10 car parking spaces - a difficult achievement - particularly with the planned store expansion being approximately 60% greater than the previous store.
The expansion plans were submitted to Luton Borough Council 2015 and it is expected that a decision will be made in February 2016.
Featured articles and news
Art of Building CIOB photographic competition public vote
The last week to vote for a winner until 10 January 2025.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.
20 years of the Chartered Environmentalist
If not now, when?
Journeys in Industrious England
Thomas Baskerville’s expeditions in the 1600s.
Top 25 Building Safety Wiki articles of 2024
Take a look what most people have been reading about.
Life and death at Highgate Cemetery
Balancing burials and tourism.
The 25 most read articles on DB for 2024
Design portion to procurement route and all between.
The act of preservation may sometimes be futile.
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.